Guide · Permits
Do You Need a Permit for an EV Charger? Fresno & Clovis Rules, Explained
Short answer: for a new circuit, yes — in Fresno, Clovis, Madera, and everywhere else we work. Here's why the permit exists, what the process actually looks like, and the one case where you might not need one.
Why EV chargers are permitted work
An EV charger is the hardest-working circuit in a modern home: it pulls its full rated current for hours at a stretch, often all night, unattended. The National Electrical Code treats it as a continuous load and requires a proper load calculation on your service. The permit is how the city verifies that math happened — and the inspection is how it's proven in your actual panel, not just on paper.
- Safety: the load calculation is what keeps a 100-amp panel from quietly overheating
- Insurance: unpermitted electrical work is a common claim-denial reason after a fire
- Resale: permitted work is a documented asset; undocumented work is a disclosure problem
- The charger warranty and most incentive programs assume a code-compliant install
What the process looks like with us
01
Assessment & upfront quote
We assess your home's electrical system, recommend the best charger for your EV, and provide a transparent, upfront quote — no hidden fees.
02
Permits handled
Our team handles all necessary permits and approvals, ensuring your installation meets local and state electrical codes.
03
Professional installation
Our crew installs your Level 2 EV charger under our California general contractor license, upgrades circuits if needed, and performs safety checks for code compliance and reliability.
04
Testing & rebate help
We test the charger, make sure it's fully functional, and guide you on optimal charging settings. Plus, we help you apply for rebates and incentives to maximize savings.
Translation: you fill out a two-minute form and approve a quote. The application, the load calculation, the inspection scheduling, and the final sign-off are ours — the cities' building divisions see our paperwork every week.
City notes
- Fresno: electrical permit through the city's Development Services; expedited EV-charging review is the norm for standard circuits
- Clovis: permit through the Building Inspection / Development Services division; same-day counter issuance is common for a single circuit
- Madera & the county areas: city building division inside city limits; Fresno or Madera County permits for unincorporated addresses — we route it correctly either way
- Panel & service upgrades anywhere: add PG&E coordination for the meter work; we schedule it so the outage window is hours, not days
Every city we serve, by permit office
| City | Permit office | Good to know |
|---|---|---|
| Fresno | City of Fresno Building and Safety Services Division | Expedited EV-charging review is the norm for standard circuits; permits run through the city's online portal. |
| Clovis | City of Clovis Building Division | Counter issuance the same day is common for a single circuit. |
| Madera | City of Madera Building Division | Runs an expedited permitting process specifically for EV charging stations. |
| Selma | City of Selma Building Division | Electrical permit and final inspection for a new 240V circuit — we file and schedule both. |
| Sanger | City of Sanger Building Division | Electrical permit and final inspection for a new 240V circuit — we file and schedule both. |
| Reedley | City of Reedley Building Division | Electrical permit and final inspection for a new 240V circuit — we file and schedule both. |
| Fowler | City of Fowler Planning Department | Permits are handled at City Hall — a small counter, no portal queue. |
| Kerman | City of Kerman Building Division | Unincorporated addresses just outside town permit through Fresno County instead — we route it. |
| Kingsburg | City of Kingsburg Building Department | Electrical permit and final inspection for a new 240V circuit — we file and schedule both. |
| Visalia | City of Visalia Building Division | Unincorporated addresses permit through Tulare County. SCE territory — no PG&E coordination on meter work. |
| Tulare | City of Tulare Building Division | SCE territory — no PG&E coordination on meter work. |
| Hanford | City of Hanford Building Division | Kings County seat; unincorporated addresses permit through Kings County. |
| Merced | City of Merced Development Services | Unincorporated addresses permit through Merced County. |
| Dinuba | City of Dinuba Building Division | Electrical permit and final inspection for a new 240V circuit — we file and schedule both. |
| Chowchilla | City of Chowchilla Building Division | Unincorporated addresses permit through Madera County. |
| Lemoore | City of Lemoore Building Division | Unincorporated addresses permit through Kings County. |
| Exeter | City of Exeter Planning Division | Permit center at City Hall. SCE territory. |
| Porterville | City of Porterville Building Division | Unincorporated addresses permit through Tulare County. SCE territory. |
| Farmersville | City of Farmersville Building Division | The city contracts plan check and inspection to the Tulare County Building Department. SCE territory. |
| Woodlake | City of Woodlake Building Division | SCE territory — no PG&E coordination on meter work. |
| Lindsay | City of Lindsay Building Department | SCE territory — no PG&E coordination on meter work. |
The one honest "maybe not": plugging a charger into an existing, permitted 240V outlet needs no new permit — that's using an outlet, not building a circuit. But have the circuit verified under load first; an old dryer receptacle isn't automatically EV-ready.
Quick questions
How long does the permit process take?
For a straightforward charger circuit, the permit is typically issued over the counter or within a few business days in the cities we serve; the inspection is scheduled after the install and usually happens within days. Panel upgrades and service work can take longer because the utility may need to coordinate a meter pull. We sequence all of it so your install day doesn't wait on paperwork.
How much does the permit itself cost?
Permit fees vary by city and project scope — typically a modest line item compared with the install. Ours is included in your upfront quote, so the number we give you is the number you pay; there is no separate 'permit fee' surprise later.
Can I pull my own permit as the homeowner?
California allows owner-builders to pull permits for their own home. You'd still need the load calculation, the inspection, and you'd own the liability for the work — and if you hire it out, the contractor should be the one on the permit. Our recommendation: let the installer permit it. It costs the same inside the quote and puts the responsibility where it belongs.